Trailer Production Day 1
Call time:3:34pm
|
Weather: cloudy
|
|
||
Production
Contacts:
Director:Dylan/seth
Camera Operator: Dylan/seth
Any other jobs: adam/lewis
|
Phone
numbers:
Adam:
07******
Lewis:0*******
Seth:07*******
Dylan:07*******
|
Email
addresses:
l*****@outlook.com
a*****@live.com
d******@gmail.com
s*******@live.com
|
||
|
|
|
||
Set/Scene/Storyboard frame
|
D/N
|
Location:
|
Synopsis:
|
Cast:
|
Study zone/Office Intro/1
|
D
|
Sixth Form Study Zone
|
|
Geoff (Alfie)
Boss (Mr Brewis)
|
Street/Walking Home/2
|
D
|
Cheam Roads/A217
|
|
Geoff (Alfie)
Pedestrian (Dylan)
|
Production
Requirements
|
Who
is responsible?
|
Travel: car
|
Seth
|
Catering:N/a
|
N/A
|
Props: Laptop/office stationary
|
Lewis/Adam
|
Costumes: office attire
|
Adam
|
Hair & Make-Up:N/A
|
N/a
|
Health and Safety
|
- Environment - Filming on main roads/A roads can be dangerous for
actors and crew because of fast moving cars. To avoid this danger we remained
on pedestrian pathways and only crossed the road when it was safe.
- Clothing – Coat to keep warm in the colder outside environment.
-Climbing stairs carefully.
|
Travel
|
|
|
|
Name
|
Travel Method
|
Departure time + additional info
|
Return time + additional info
|
Seth Miles
|
Car
|
Depart: Gatwick 3:30
Arrive: Cheam high School 4:10
|
Depart: Cheam high School 5:10
Arrive: Worcseter park(home) 5:30
|
No comments:
Post a Comment